A limit equilibrium model to simulate time‑dependent pillar scaling in hard rock bord and pillar mines

dc.contributor.authorWessels, Danel Georgina
dc.contributor.authorMalan, D.F. (Daniel Francois)
dc.contributor.emailfrancois.malan@up.ac.zaen_US
dc.date.accessioned2024-07-12T13:24:25Z
dc.date.available2024-07-12T13:24:25Z
dc.date.issued2023-05
dc.descriptionDATA AVAILABITY STATEMENT: The authors declare that all the data supporting the findings of this study are available within the article.en_US
dc.description.abstractThis study investigated the use of a limit equilibrium model to simulate the time-dependent scaling of hard rock pillars. In the manganese bord and pillar mines in South Africa, extensive scaling is observed for pillars characterised by a high joint density. It appears that the scaling occurs in a time-dependent fashion. Evidence for this is the ongoing deterioration of pillars in old areas, even after the pillars are reinforced with thin spray-on liners. Monitoring of selected pillars were conducted in an attempt to quantify the rate of time-dependent scaling. Contrary to expectations, almost no additional scaling was recorded for the pillars during a 3-month monitoring period. The scaling distance for pillars of diferent ages could be measured and it seems as if most of the scaling occurred soon after the pillars are formed. Only a limited amount of additional timedependent scaling seems to occur after this. Numerical simulations of the time-dependent scaling were conducted using a displacement discontinuity code and a limit equilibrium constitutive model. The postulated exponential decay of the failed rock mass strength at the edges of the pillars resulted in simulated behaviour that is qualitatively similar to the underground observations. The results from this study are encouraging and the method can be used to investigate the long-term stability of bord and pillar excavations. Further work is required to improve on the calibration of the model and to better quantify the rate of scaling of the underground pillars.en_US
dc.description.departmentMining Engineeringen_US
dc.description.sdgSDG-09: Industry, innovation and infrastructureen_US
dc.description.sponsorshipUniversity of Pretoria.en_US
dc.description.urihttps://link.springer.com/journal/603en_US
dc.identifier.citationWessels, D.G., Malan, D.F. A Limit Equilibrium Model to Simulate Time-Dependent Pillar Scaling in Hard Rock Bord and Pillar Mines. Rock Mechanics and Rock Engineering 56, 3773–3786 (2023). https://doi.org/10.1007/s00603-023-03239-w.en_US
dc.identifier.issn0723-2632 (print)
dc.identifier.issn1434-453X (online)
dc.identifier.other10.1007/s00603-023-03239-w
dc.identifier.urihttp://hdl.handle.net/2263/96996
dc.language.isoenen_US
dc.publisherSpringeren_US
dc.rights© The Author(s) 2023. This article is licensed under a Creative Commons Attribution 4.0 International License.en_US
dc.subjectTime-dependent pillar failureen_US
dc.subjectLimit equilibrium modelen_US
dc.subjectBord and pillar layouten_US
dc.subjectSDG-09: Industry, innovation and infrastructureen_US
dc.titleA limit equilibrium model to simulate time‑dependent pillar scaling in hard rock bord and pillar minesen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Wessels_Limit_2023.pdf
Size:
2.15 MB
Format:
Adobe Portable Document Format
Description:
Article

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: